While performing maintenance checks, you discover an unsafe procedure on the MRC. After informing your workcenter supervisor, what should be submitted?
Seeking please wait...
Term | Definition |
|
Term what is on the second page of the work center PMS manual | | Definition |
|
Term what is in the bottom left corner of the second page of the 43P1 | | Definition List of current force revision | |
|
Term who validates the list of qualified personnel | | Definition |
|
Term what info can i find on the record of change page | | Definition 1. work center supervisors signature2. date changed3. date entered 4. force revision
| |
|
Term | Definition |
|
Term what is another name for the LOEP | | Definition |
|
Term what does the LOEP tell you | | Definition |
|
Term | Definition |
|
Term what does the MIP tell you | | Definition list all periodicity codes for specific equipment | |
|
Term what are some examples of different periodicity codes | | Definition A- annuallyQ- quarterlyW- weeklyS- semi annuallyM- monthlyR- situational or as required D- daily | |
|
Term how often would we perform (A4R) | | Definition |
|
Term what does 2.5 man hours mean | | Definition two hours and thirty minutes | |
|
Term | Definition |
|
Term recommended rate is only mandatory for what three things | | Definition nec specificDCPO safety PO | |
|
Term pertaining to the 13 week report how many weeks are kept in the work center | | Definition |
|
Term how many weeks are kept in the 43P1 | | Definition |
|
Term who signs the 13 week report | | Definition |
|
Term what does the maintenance person fill out on the 13week report | | Definition date completed tag out block (not the tag out number) | |
|
Term if the work was completed what does the maintenance person put in the periodicity block | | Definition |
|
Term if the work could not be completed what does the maintenance person put in the periodicity block | | Definition cirle and write why you couldnt complete the job in the flip page | |
|
Term what does ESOMS stand for | | Definition Electronic shift operations management system | |
|
Term who is the first person to sign the danger tag | | Definition |
|
Term who is the second person to sign the danger tag | | Definition |
|
Term who is the third person to sign the danger tag | | Definition |
|
Term who else signs the 13 week report | | Definition work center supervisor at the end of the week to acknowledge that all the maintenance has been complete | |
|
Term | Definition maintenance requirement card | |
|
Term what can i find in the bottom right corner of the MRC | | Definition |
|
Term what is the first part of the SYSCOM control nummber | | Definition |
|
Term what is the second part of the SYSCOM control number | | Definition |
|
Term what is the third part of the SYSCOM control number | | Definition |
|
Term how many characters is the date code | | Definition |
|
Term what is the first part of the date code | | Definition |
|
Term what is the second part of the date code | | Definition |
|
Term for the months containing two digits (Oct, Nov, Dec) what are the characters that represent the months | | Definition 1. A- Oct2. B- Nov 3. C- Dec | |
|
Term true or false? in the tool, parts, and materials block work center sup can substitue for materials and parts | | Definition |
|
Term true or false? in the tools, parts, and materials block work center sup can substitute for tools and house hold consumables | | Definition |
|
Term | Definition |
|
Term what does the EGL show me | | Definition lists all associated equipment for job | |
|
Term how many man hours can be reflected on the EGL | | Definition a single days work (8hours) | |
|
Term | Definition OPNAVINST for force afoat safety manual | |
|
Term what is chapter 1 of the 5100.19e | | Definition |
|
Term what is chapter 9 of the 5100.19e | | Definition electrical safety (safety observer must be CPR qual) | |
|
Term what is chapter 13 of the 5100.19e | | Definition |
|
Term what is chapter 23 of the 5100.19e | | Definition hazmat safety (must have secondary label) | |
|
Term what is required to be on the secondary label? | | Definition 1. manufacture name 2. nomenclature3. NSN 4. target organ (what does it affect...eyes, skin, airway, ect | |
|
Term | Definition hazmat users guide instruction (MSDS) | |
|
Term | Definition carl vinson's hazmat instruction and disposal method | |
|
Term | Definition |
|
Term what is the most recent change of the 4790.8c | | Definition force revisions are made twice quarterly as opposed to four times quarterly | |
|
Term how many types of feed back reports are there | | Definition |
|
Term who administers all 3m tests onboard carl vinson | | Definition |
|
Term who is the 3-m manager onboard CVN70 | | Definition |
|
Term who sponsors the navy's 3-m program | | Definition |
|
Term what color is a danger tag | | Definition |
|
Term what color is a caution tag | | Definition |
|
Term how often is an MRC with periodicity Q-2 required to be accomplished | | Definition |
|
Term what best represents the main purpose of 3m | | Definition to ensure maximum equipment readiness meeting minimum specifications | |
|
Term what is the procedure in verifying a MRC against the work center PMS manual | | Definition MRC to MIPMIP to LOEP LOEP to THE CHANGE PAGE check for current revisions | |
|
Term | Definition standard PMS material identification guide | |
|
Term | Definition 5 digit cross reference used to identify each tool, parts, or material listed on the MRC | |
|
Term what computer based system does the CVN70 use to schedule, track, and assign PMS | | Definition |
|
Term what sked PMS schedule shows all the maintenance requirements to be completed for the week | | Definition |
|
Term what sheet is signed by the maintenance person after completion of the maintenance | | Definition |
|
Term who annotates on the 13 week report or back page the reason for non-accomplishment of maintenance requirement | | Definition |
|
Term what color is a classified MRC | | Definition |
|
Term what are the conditions for a piece of equipment to be place in an IEM status | | Definition -inactive for corrective maintenace -inactive for 30days or more -stored at location off the ship | |
|
Term | Definition |
|
Term | Definition |
|
Term | Definition |
|
Term | Definition inactive equipment maintenance | |
|
Term | Definition |
|
Term what are the three parts of a Job control number | | Definition -unit identification code-work center -job sequencing number
| |
|
Term | Definition |
|
Term | Definition |
|
Term name the ship's maintenance management system manual | | Definition |
|