How a house is built step by step

  • What Is Building Construction?
  • Building Construction Process Start To Finish
  • A. Pre-Construction Steps (Phase – I)
  • Building Construction Step (Phase – II)
  • Building Construction Process Step by Step pdf
  • Watch Video: Building Construction Process With 3D Model
  • FAQs:

Building Construction Process From Start to Finish involves any type of construction that is not an easy task; perhaps it requires lots of effort and investment.

Althoughbuilding construction requires lots of time and is tedious work, its result is a permanent asset for us.

The residential building construction process is a systematic task done by skilled persons. Therefore, care should be taken in the building construction process step by step pdf.

Before planning, building construction projects must consider important aspects of house construction steps like the purpose of construction, utility, financial proficiency, the demand for work, etc. 

As the decision of building construction is taken, the planning phase is started. The building construction process from start to finish (pdf) is discussed here in detail. First of all start with some preconstruction steps.

The House Construction Steps are explained in detail below:

Read More: 17 Tips For How To Reduce Construction Cost


Building Construction Process Start To Finish

Following are the Steps Involved in Building Construction Process from Start to Finish Pdf,

A. Pre-Construction Steps

  1. To Acquire Land or Plot.
  2. To Seek Technical Help.
  3. Prepare Estimation and Budgets.
  4. Permission from Authorities.
  5. Approach a Builder.
  6. Superstructure – Column.

B. During Building Construction Steps

  1. Site Preparationor Levelling work
  2. Excavation and PPC
  3. Foundation
  4. Plinth Beam or Slab
  5. Superstructure – Column
  6. Brick Masonry Work
  7. The Lintel Over Door Window Gaps
  8. Floor Slab or Roof Structure
  9. Door Window Framing and Fixations
  10. Electrical and Plumbing
  11. Exterior Finishing
  12. Terrace and Roof Finishing
  13. Internal Finishes
  14. Woodwork and Fixture Fittings
  15. Waterproofing
  16. Painting Work

Let’s discuss the stages of the building construction process in detail


A. Pre-Construction Steps (Phase – I)

1. To Acquire Land or Plot

It is the most important step in building construction. Search for the location of the building which is best suited for building construction purposes.

Be careful while selecting land which has all the desired facilities available nearby and should be free from all land-related issues.

It is suggested that prior data collection before buying land or plot either by doing research online or seeking help from real estate agents or concerned persons regarding the effective cost of the same.

2. To Seek Technical Help

After selecting proper land for building, take the help of a professional architect to create building designs and take his/her advice. An architect prepare plan as per building requirement, number of flats, and shops based on your requirements and budget.

Then the architect consults with a structural engineer for details of the reinforcements to be used, how deep your foundationwill be, the size of gravel to be used, pillar width, etc.

3. Preparing Estimate and Budget

Building construction involves a huge amount of material and budget. After, planning and structural detailing have been completed these details are transferred to the building estimator.

The building estimator will estimate the material quantity, and quantity of different items of work, and prepare an abstract sheet that shows the cost of building construction.

If financial resources are limited, we need to seek preapproval for loans in advance, or else you may end up in a cash crunch situation.

This is important work to do after the project is ready to be executed. For that, we have to take permission from thelocal municipal body before you could go for the construction.

Following are the list of document project required before applying for permission. This document may differ from state to state, but some are essential for every building construction work.

a) Land survey: Survey of the land has to be carried out with the help of an authorized land surveyor

b) Soil test report of the land.

c) Land documents.

d) Architecture/ elevation/ sectional drawings.

e) Structural report.

f)  Architect Certificate of undertaking on Record and Certificate of the undertaking of Civil Engineer on Record

Read More: Building Materials List | Building Construction Materials List | Construction Materials List |


5. Approach a Builder

A builder or contractor for construction must be chosen carefully because it is a major factor in securing building construction quality and timely construction of work.

Pre-investigation must be done about the builder before handing in work. In the contract document, all the work-related details must be clearly stated.

The contract document should cover layout and work details along with the payment methods, time scales, and costs. The condition of the contract should be thoroughly checked before signing a final deal.


Building Construction Step (Phase – II)

The following are the building construction steps involved in any type of construction.

1. Site Preparation or Leveling

The construction site must be cleaned before the work is executed. This work involves the removal of roots of trees, and debris, and leveling ground area.

2. Excavation and PCC

The foundationof the building ground is excavated with the help of excavating machines as per the building dimension specified in the drawings.

In this foundation trench, a layer of PCC (Plain cement concrete) is laid in the dug portion before placing the reinforcements for the foundation.

3. Foundation

How a house is built step by step
Building Foundation Construction

The building is supported on the foundation is the lowermost part of the building that is in contact with the soil.

A building is a load transferred from the superstructure to the soil and needs to be extremely strong to handle the load.

After the PCC work foundation reinforcement work is started. The foundation’s bottom level must check before concreting it. The remaining space between the foundation is filled with earth.

4. Plinth Beam and Slab

How a house is built step by step
Plinth Beam

After the foundation work is done ground beam formwork preparation is started and poured with concrete. Over the plinth beam, masonry work is started. And space between the foundation and plinth beam is filled with soil.

Read More: Standard Ceiling Height | Ceiling Height | Average Ceiling Height 


5. Superstructure – Column

The superstructure is the portion above the plinth level of the building. The main component of the superstructure is a column and beam. 

The columns are built up to slab level and the frame for further construction is prepared.

How a house is built step by step
RCC Frame Structure

6. Brick Masonry Work

As the column and beam framework is completed masonry work is started with different materials such as bricks, concrete blocks, fly ash bricks, etc. according to the building drawing.

Masonry work is done using a cement mortar mix. It is a mixture of cement & sand. During this carefully and as per drawing gaps are laid for doors and windows during the masonry work.

7. The Lintel Over Door Window Gaps

The lintel is constructed on the door and window to support the masonry work over it. After this further masonry work is done.

8. Floor Slab or Roof Structure

Then the formwork is started to construct the slab resting on the column and beam. Over slab formwork, slab reinforcement is placed as per slab detailed drawing.

9. Door Window Framing and Fixations

After that door window frames are fixed at their specified position given in the drawing.

10. Electrical and Plumbing

How a house is built step by step
Electrical Pipe in Slab
How a house is built step by step
Electrical Conduit Wiring

As we know buildings are constructed with a clean finish in which electrical and plumbing work is not visible.

They are installed in the walls and slabs such that they are concealed and not visible after the finishing work is done.

The point and pipe ends are left out such that later they can be finished with the electric fitting and plumbing fixtures.

Read More: 25 + Types Of Doors For Your Perfect House


11. Exterior Finishing

Once this work is completed,external plastering and finishing work is started. Waterproofing is also done to prevent rising dampness in the wall. External cladding can also be done to enhance the elevation of the house.

12. Terrace and Roof Finishing

On top of the slab, waterproofingis done to prevent any leakage in the slab. Generally, terrazzo tiling is done to prevent the slab from a weathering effect.

13. Internal Finishing

Internal walls are plaster with a smooth finish and flooring is done with tiles. Later on, the walls are painted or textured.

14. Woodwork and Fixture Fittings

By following the above step, almost all construction work is completed, and then furniture work is started. Side by side, electrical fitting, switchboard, and plumbing fittings are complete in the bathrooms and kitchen areas too.


15. Waterproofing

Waterproofing is a method that prevents water from penetrating your house. Waterproofing is very important as it helps keep your house dry. It helps reduce humidity inside the house and thereby protects things inside your house from damage caused due to humidity or water exposure

16. Painting Work

The most important purpose of house painting is to give our house a long life and adding colors to it is to give our house a beautiful makeover

The painting work not only adds colors to house walls but protects their house from all stains and dirt and gives their house a long life, however, walls have a way of finding some stains.

There are various paint qualities which can be used to protect our house for a long time from stain, mud, sunlight, rain, dirt, etc. from basic paint to high-quality paint which can give our house 5 to 10 years of extra life and an amazing look for exterior and interior as well.

The last step of building construction is interior decoration work in completing the building construction with proper furnishing and fabric used.

Building Construction Process Step by Step pdf

The process of building construction involves different stages of work that are executed by engineers and supervisors.

The major preconstruction work is done by the architect, structural designer, and management team.

Free download Construction Stages of Building a House pdf,


Watch Video: Building Construction Process With 3D Model

Building Construction Process

FAQs:

How do you build a house from start to finish?

It can be done in two phases:
1. Phase I- Pre-Construction.
2. Phase II- Building Construction Steps.
Each Phase has its own steps of construction.

What is the First step in Building Construction?

The first step in the construction of the building is Site Preparation and Leveling. The site to be constructed must be prepared for construction before the work is executed along with cutting and filling to maintain the plain.

What are the steps in the building construction process?

A. Pre-Construction Steps
1. To Acquire Land or Plot
2. To Seek Technical Help
3. Prepare Estimation and Budget
4. Permission from Authorities
5. Approach a Builder
6. Superstructure Design

B. During Building Construction Steps
1. Site Preparation and Levelling work
2. Excavation and PPC
3. Foundation Plinth Beam or Slab,
4. Superstructure Column construction
5. Brick Masonry Work
6. The Lintel Over Door Window Gaps
7. Floor Slab or Roof Structure
8. Door Window Framing and Fixations
9. Electrical and Plumbing
10. Exterior Finishing
11. Terrace and Roof Finishing
12. Internal Finishes 1
3. Woodwork and Fixture Fittings.

What Is Building Construction Process?

The process of constructing the different elements of a building on a construction site is called the building construction process. Building construction has different stages like planning, designing, site preparation, foundation plinth construction, column, beam, slab construction, plastering, and finishing work.


You May Also Like

  • 17 Tips On How to Reduce Construction Cost | Home Construction Tips
  • Which Cement Is Best For House Construction
  • Standard Ceiling Height | Ceiling Height | Average Ceiling Height 
  • 25 + Types Of Doors For Your Perfect House
  • Construction Drawings | Types of Construction Drawing Used In Building Construction